20 November
System installed provided Pool, Hot water and floor heating. The lower levels consisted of burnished concrete floors and the upper levels were timber flooring. Working with the project manager/ builder onsite, this allowed Progressive Energy to use our in-house designed installation of the UFH to the timber areas providing greater comfort and efficiency. System heat sources Greenland Solar thermal evacuated tubes and Natural gas Condensing boilers within a zoned-control system.