• invisible house - blue mountains
  • Invisible House- Blue Mountains
  • Invisible House- Blue Mountains
Date
About This Project

Award-winning Invisible House located in the stunning Blue Mountains NSW. This project is a great example of working alongside the architect before construction enabling early design covering the hydronic heating providing thermal modeling, This highlighted some areas that the architect could change to assist to reduce the heat load of the final building design without compromising the architects vision.  The final system used progressive Heat pumps and Condensing Gas Boiler technology for the UFH and a Domestic heat pump Hot water system.

AWADUCT passive cooling system was also installed to assist with summer cooling and winter pre-heating.